Tank · Hopper · Silo
Weigh module kits
for process vessels
Specify the mounts, load cells and installation hardware together. Start with the vessel’s support geometry, gross weight and operating conditions.
Kit families
Match the mount to the vessel
Choose the load path, movement and restraint first. Finalize plate geometry, cell rating and installation hardware on the drawing.
Vessel kit sizing
Size a 3-, 4-, 6- or 8-support kit
Prepare a preliminary capacity and send the operating conditions with your RFQ.
Field integration
Plan thermal travel and installation access
A typical concept uses a fixed reference, a guided support and floating supports. The released layout defines the directions, travel and restraint clearances for the actual vessel and piping.
Check an existing footprint ↗- Trace the vertical load path. Compare empty, full and eccentric filling reactions. Review lateral and uplift load cases separately.
- Reserve movement at the nozzles. Check cold-to-hot support travel and piping reaction in each operating state.
- Plan the cell installation. Review temporary blocks, locking and the welding return path before rigging or hot work.
Vessel weighing questions
Download the engineering handbook · PDFWhat is a weigh module?
A weigh module combines a load cell with the hardware that introduces vessel load into it. A kit adds matched supports and the agreed signal-summing and installation accessories.
How many weigh modules does a vessel need?
Use a module at each active weighing support. Three- and four-leg kits are typical. Six- and eight-leg systems need a support-reaction review and shimming plan because extra supports increase sensitivity to frame stiffness and uneven bearing.
Can the kit connect to a PLC?
We supply mechanical tank and silo weigh modules with load cells. Connect the summed output through a compatible weight transmitter or controller and confirm its input, excitation and PLC interface.
Does the preliminary 1.5× factor cover wind or seismic loading?
Use it to screen a gravity-load capacity. Evaluate overturning, uplift, shear, agitation, shock and anchor loads independently with the vessel engineer.
Can I reuse the existing bolt holes on a retrofit?
Send the exact model, capacity, installed height and dimensioned top and base interfaces. The proposed replacement drawing must match the field dimensions and the required load cases before release.